Ways to price and run a renovation, compared

Fixed price, cost-plus, time and materials, design-build, construction management, acting as your own general contractor and hourly handyman work, side by side.

The way a renovation is priced and organised changes who carries the risk of surprises. This table compares the common contracting arrangements used for Canadian home renovations. It compares structures, not companies or prices; any contractor may offer several of them. Read across a row to see how each arrangement works, when it suits a project and what to watch out for, then use the quote checklist to make quotes comparable.

Select a column header to sort.

ArrangementHow it worksBest fit whenWatch out for
Fixed price (stipulated sum)One price for a defined scope; changes are priced through written change ordersPlans and finishes are chosen before signing and the house has few unknownsThin scope descriptions, low allowances and expensive change orders; hidden conditions may be excluded
Fixed price with allowancesFixed price for labour and most materials, plus dollar allowances for items you pick laterYou need to start before every finish is selectedAllowances set unrealistically low to make the quote look cheaper; check whether they include installation and tax
Cost-plus (percentage or fixed fee)You pay actual costs of labour, materials and subtrades plus a markup or fixed feeOlder houses with many unknowns, or high-end work where choices evolveNo ceiling unless the contract sets one; you need invoices and regular cost reports
Time and materialsHourly or daily labour rate plus materials, billed as work proceedsSmall repairs and jobs where the scope cannot be definedBudgets drift; ask for a written estimate and, in Ontario, note the CPA's limit on charging more than 10% above an estimate
Design-buildOne firm handles design, drawings, permits and construction under one contractYou want a single point of responsibility and help with designDesign fees may be payable even if you do not build; make sure drawings are yours to use
Construction management or project managerA manager organises trades you contract with directly, for a feeLarger projects where you want transparency on each trade's priceYou take on more contracts, more risk and possibly owner duties under lien and workplace safety laws
Owner as general contractorYou hire and schedule each trade yourselfYou have time, experience and a simple projectPermits, inspections, sequencing, warranties and lien holdbacks become your responsibility; trade licensing rules still apply
Handyman, hourlySmall tasks billed by the hour or per jobMinor repairs, painting, fixture swapsWork that needs a permit or a licensed trade (electrical, gas, plumbing in some provinces) is often outside a handyman's scope

The arrangements above are common practice, not legal categories, and contracts may mix them. Whatever the structure, provincial consumer protection laws set rules for written contracts, estimates and cancellation rights, and lien acts may require holdbacks. Check the rules on your provincial consumer protection office's website (for example Consumer Protection Ontario, Consumer Protection BC, Alberta's consumer protection pages and Quebec's Office de la protection du consommateur), and Quebec's RBQ for licensing. See what a renovation contract should include.