Renovation contingency calculator

Add a contingency percentage and fixed allowances to your base estimate to get a total renovation budget you can plan around.

CAD
%
CAD
CAD
Contingency plus allowances
–
Total budget before tax
–

Illustrative estimate only — not an offer or quote.

A contingency is money you set aside for what nobody can price yet: rot behind the tile, knob-and-tube wiring, a joist that has to be sistered, a building inspector's requirement or a change you decide on halfway. Enter your base estimate, a contingency percentage, any fixed allowances and owner costs outside the contract.

Formula: contingency = base × percentage + fixed allowances; total budget = base + contingency + owner costs.

Worked example (illustrative, the default): a $60,000 kitchen with a 15% contingency and $2,000 of allowances: contingency = $60,000 × 15% + $2,000 = $11,000. With $2,500 of owner costs, the total budget before tax is $60,000 + $11,000 + $2,500 = $73,500.

Choosing a percentage: there is no official figure. As a planning rule of thumb, many owners use around 10% for a cosmetic job in a newer house and 15–20% or more for older houses, structural work, basements with moisture history or projects where plans are not final. Read how much contingency to keep.

Limits: a contingency is not permission to spend; changes should still go through written change orders. Add sales tax to the total with the sales tax calculator.

Related guides

Estimates, quotes and contracts

How much contingency should a renovation budget have?

How to choose a renovation contingency percentage for Canadian homes, what it should and should not cover, allowances versus contingency, worked examples and rules for spending it.